Junkyard brewery

90% complete, I still need to add a pump and insulate the mash tun (and a few other minor plumbing details). Any ideas on insulating without looking crappy (or creating a fire hazard)? I'm just going to have to leave out the trailer hitch for now.

Aside from the burners,tubing and valves, the metal all came from the scrap pile.

I was hoping to make the March meeting, but will have to wait for the next one to get to meet y'all.

ARMAFLEX SHEETS WORK GREat

ARMAFLEX SHEETS WORK GREat TO INSULATE THE MASH TUN.

Very impressive for junk...

Very impressive for junk...

I agree with Will, the

I agree with Will, the brewery looks great!

the brewery looks great

the brewery looks great

insulation ideas

any ideas on insulating a converted keg mash tun? I was thinking of using black rubatex, but wasn't sure how it would hold up.

pump suggestions?

Does anyone know of any decent (economical) pumps out there for moving hot water safely? I know the march 809 mag-drive is the best, but since all I'm doing is getting the hot liquor up to the sparge arm, I was hoping to get out with a smaller investment.

I think I screwed up the

I think I screwed up the "photo-attachment process". I'll have to re-read the photo posting instructions.

I am jealous

Man, I only wish I could put something like that together. It was probably easy to do, but I can barely turn a screw driver!